Fixed-bridge and half-bridge rotating scrapers can be added to tanks where thickening/clarifying is required.
Where bridges are to be installed the tanks are strengthened where required to carry the additional loading, a top runway track is added for rotating scrapers and perimeter launder channels with weir plates and scumboards can also be added.
